Power Transmission Line Construction Map v 1.0

Date December 9, 2019 15:39

– 2 Iveco Prapor 8×8 Trucks with its own cargo (5 and 3 points)
– 1 Warehouse (changed by Sawmill)
– 4 Power Line Installers (Sawmill changed)
– 1 Gas Station Lukoil Komi (refueling changed)

Credits:
potomuchtotak2019

DOWNLOAD [62 MB]


Leave a Reply

Your email address will not be published.

  • Sponsored links
  • Actions